You can come to us before you even have land. We'll help you with the early steps and recommend an architect if you need one. Once your project starts taking shape, we bring your architect in, help choose the best wall system (MHM, CLT, or light timber frame) and go over a rough budget together.
We check where you are, even before you've bought land
We bring in your architect, or recommend one we trust
We review the best wall system, backed by timber-specific engineering
We come back with a clear price straight from the factory: wall system, insulation, windows, finishing materials, all worked out together. Fixed, transparent, so you know exactly where you stand before you commit.
Wall system, insulation
Windows, glazing
Finishing materials, interior details
Once the concept is set, our engineers take over. Structural calculations, heating, ventilation, full construction drawings, all finalized before production starts. Every detail is resolved on paper first, so the build itself runs smoothly.
Structural calculations completed
Heating, ventilation planned
Full construction drawings finalized
Your home is prefabricated in the factory under controlled conditions. Every part is made to precise tolerances, checked before it ships. Built indoors, it stays protected from weather, nothing leaves until it's right. It’s the speed of modular building, without the standard floor plans: every panel is made for your design.
Wall elements cut, insulated and finished indoors
Windows, finishes fitted before shipping
Every panel checked before it leaves the factory
Your finished home travels from Estonia to your plot in Portugal, a journey that takes about one week. Transport is carefully scheduled so it arrives ready to go up, with your groundwork already prepared, waiting.
Transport takes about one week
Route, schedule planned in advance
Groundwork ready before arrival
We fly in our own Estonian teams to raise, finish the house: assembly crews, electricians, ventilation, heating, plumbing specialists, working alongside local teams where it makes sense. On-site work takes a minimum of 3 weeks, covering everything from structural assembly through waterproofing. Total time depends on how much finishing work you want us to handle.
Minimum 3 weeks
Structural assembly through waterproofing
Total time depends on finishing scope